Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 2633 articles
Browse latest View live

Re: Want to change valid to date in BOM component uning change number

Hi Xjoe, In stranded it is possible  to fix or change the valid from date but to change valid to date I would suggest you to  go with the logic of expert Rohit and Caetano. Thnaks vishal.

View Article


Re: How to split Planned order created in month for different requirement...

Hi Ameya, My sceanrio is MTS, I changed individial/collective indicator to 1 and lot size EX. Then run MRP after deleting created planned oorder, it still creates one planned order for both the...

View Article


Factory calender issue

We have assigned same factory calender (assigned one holiday calender ) to 2 plant for 7 day. but still in one plant its showing 7 days in  MF50 while in other its showing only 6 days. what may be the...

View Article

Re: Factory calender issue

Hi Harshal, If same factory calendar is assigned to both plants then check the factory calendar maintained in Capacity view of work center / Production line. Go to capacity tab of work center and then...

View Article

Re: Optimum Lot size for production

Dear Krish Hait I suppose you are using MRP type PD or something like this (planning to demand) without safety stock (MTO). In this case, if any demand appears, system will propose a replanishment. No...

View Article


Re: Plan cost in production order

In the material master, Accouting 1, do you have some standard price assigned? If yes, this might be considered, depending on your customizing... Rgds,

View Article

Re: Optimum Lot size for production

Hello When using MRP type PD or similar, system will not let the demand uncovered. That means, if there is a requirement, MRP will propose the replenishment.  Maybe you can develop your own logic using...

View Article

Image may be NSFW.
Clik here to view.

Re: Lot size key must link to planning calendar

Hi Team,Thank you for your explanations. As there is check in the program that's we are not able to save thematerial while using the Lot size key.  BRBhagee

View Article


Re: To remove automatic batch determination in REM

Hi Rupesh, We did implement the note in Development, but still the screen appears. I do not understand why.

View Article


Re: Confirmation Value not updated in CO

Hello Sharvari, Please go through below document, hope this will help you. Why Actual Activity Cost ZERO for Production Order     Regards,Pankaj Bhalerao.

View Article

Re: Different BOM authorisations for different plants and activities

Hi John,I hope you might have checked this earlier pots,If not this may be helpful for you https://scn.sap.com/message/14905715#14905715 Restrict access to BOM information in chemical industry...

View Article

Re: Incorporate Barcode in the production order

Hello Andrea, You can have barcodes in print output using Smartforms. Please check if below links help: Smartforms for production order paperwork Printing Production Order Number As A Bar Code...

View Article

MD04

Hi Gurus, we have a client requirement; where there is no Sales Order will be there to consume the PIR quantity. But client wants to reduce the quantity through a Z-movement type. But in MD04 screen...

View Article


Re: MD04

Hello On the customizing transaction OMJJ, make sure that the flag "independent requirements reduction" is checked for your Z-movement. Also, check the notes mentioned on the following document: Demand...

View Article

HU without packing instruction

I do understand that when we pack for a production order we need to have pop1 and pof1 master data. COWBPACK asks for that master data to create HU for a production order. My query is, is there a way I...

View Article


Re: Confirmation Value not updated in CO

Hello Pankaj, Gone through the document performed these settings and guess what that was the correct answer for issue.  Thanks for sharing document with us all and community.  Thank you so much....

View Article

Activation of ECM for Routing at plant level

hi, Is it possible to activate Engineering change management for ROUTING at PLANT level??/ I mean There are many plants. Plant with 15**; 60**, 40**, 50** I wanted to activate ECM for change of routing...

View Article


Re: Activation of ECM for Routing at plant level

Hi VKUMAR, No as per my knowledge you cannot activate it via standard settings at plant level, it gets activated at client level. In OP5A you can make change number mandatory by marking it as a...

View Article

Re: Tracking of changes Routing

Hi Harshal, In case, table logging is active in your system, use SCU3 to check changes made in a table.  Regards,Rohit

View Article

Re: Check before 261 movement

HelloWhich methods did you try. I guess methods GM_SCREEN_LINE_CHECK or GM_SCREEN_OKCODE_CHECK from WORKORDER_GOODSMVT should work. You may also try to find an exit on the blog BAdIs and Exits for...

View Article
Browsing all 2633 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>