Re: Want to change valid to date in BOM component uning change number
Hi Xjoe, In stranded it is possible to fix or change the valid from date but to change valid to date I would suggest you to go with the logic of expert Rohit and Caetano. Thnaks vishal.
View ArticleRe: How to split Planned order created in month for different requirement...
Hi Ameya, My sceanrio is MTS, I changed individial/collective indicator to 1 and lot size EX. Then run MRP after deleting created planned oorder, it still creates one planned order for both the...
View ArticleFactory calender issue
We have assigned same factory calender (assigned one holiday calender ) to 2 plant for 7 day. but still in one plant its showing 7 days in MF50 while in other its showing only 6 days. what may be the...
View ArticleRe: Factory calender issue
Hi Harshal, If same factory calendar is assigned to both plants then check the factory calendar maintained in Capacity view of work center / Production line. Go to capacity tab of work center and then...
View ArticleRe: Optimum Lot size for production
Dear Krish Hait I suppose you are using MRP type PD or something like this (planning to demand) without safety stock (MTO). In this case, if any demand appears, system will propose a replanishment. No...
View ArticleRe: Plan cost in production order
In the material master, Accouting 1, do you have some standard price assigned? If yes, this might be considered, depending on your customizing... Rgds,
View ArticleRe: Optimum Lot size for production
Hello When using MRP type PD or similar, system will not let the demand uncovered. That means, if there is a requirement, MRP will propose the replenishment. Maybe you can develop your own logic using...
View ArticleRe: Lot size key must link to planning calendar
Hi Team,Thank you for your explanations. As there is check in the program that's we are not able to save thematerial while using the Lot size key. BRBhagee
View ArticleRe: To remove automatic batch determination in REM
Hi Rupesh, We did implement the note in Development, but still the screen appears. I do not understand why.
View ArticleRe: Confirmation Value not updated in CO
Hello Sharvari, Please go through below document, hope this will help you. Why Actual Activity Cost ZERO for Production Order Regards,Pankaj Bhalerao.
View ArticleRe: Different BOM authorisations for different plants and activities
Hi John,I hope you might have checked this earlier pots,If not this may be helpful for you https://scn.sap.com/message/14905715#14905715 Restrict access to BOM information in chemical industry...
View ArticleRe: Incorporate Barcode in the production order
Hello Andrea, You can have barcodes in print output using Smartforms. Please check if below links help: Smartforms for production order paperwork Printing Production Order Number As A Bar Code...
View ArticleMD04
Hi Gurus, we have a client requirement; where there is no Sales Order will be there to consume the PIR quantity. But client wants to reduce the quantity through a Z-movement type. But in MD04 screen...
View ArticleRe: MD04
Hello On the customizing transaction OMJJ, make sure that the flag "independent requirements reduction" is checked for your Z-movement. Also, check the notes mentioned on the following document: Demand...
View ArticleHU without packing instruction
I do understand that when we pack for a production order we need to have pop1 and pof1 master data. COWBPACK asks for that master data to create HU for a production order. My query is, is there a way I...
View ArticleRe: Confirmation Value not updated in CO
Hello Pankaj, Gone through the document performed these settings and guess what that was the correct answer for issue. Thanks for sharing document with us all and community. Thank you so much....
View ArticleActivation of ECM for Routing at plant level
hi, Is it possible to activate Engineering change management for ROUTING at PLANT level??/ I mean There are many plants. Plant with 15**; 60**, 40**, 50** I wanted to activate ECM for change of routing...
View ArticleRe: Activation of ECM for Routing at plant level
Hi VKUMAR, No as per my knowledge you cannot activate it via standard settings at plant level, it gets activated at client level. In OP5A you can make change number mandatory by marking it as a...
View ArticleRe: Tracking of changes Routing
Hi Harshal, In case, table logging is active in your system, use SCU3 to check changes made in a table. Regards,Rohit
View ArticleRe: Check before 261 movement
HelloWhich methods did you try. I guess methods GM_SCREEN_LINE_CHECK or GM_SCREEN_OKCODE_CHECK from WORKORDER_GOODSMVT should work. You may also try to find an exit on the blog BAdIs and Exits for...
View Article