Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)

Re: Single Process Order for two semi-finish material with stock updation.

Hello I think you can map the process using 101 as an intramaterial. You can post a goods receipt of this material on stock, adding it with a negative sign on the BOM of 102. Then you will include it...

View Article


Re: MFBF - Personnel number in REM backflush

Hello Reading the BAdI documentation on transaction SE18 is always a good starting point to implement a BAdI. The documentation explains that there are 2 ways of implementing this BAdI and one of them...

View Article


Re: CO78 - Deletion flag / Deletion indicator

Hello Make sure that the field "Delivery Date Overrun" is empty, otherwise, system does not pick up orders with a delivery date within this interval. Also, set the option "complete" on the field...

View Article

Re: A field with updated delivery quantity in PI Sheet

Hello You should create your own characteristic to get the information from this field. BRCaetano

View Article

Re: options to restrict invalid production version in ME11

threat closed

View Article


Re: Rough Cut Capacity Planning on Semi-Finished

Hello You could only run RCCP for a material if there is demand created for it on SOP and, as far as I know, there is no BOM explosion on SOP. Since the actual bottleneck for the finished product is...

View Article

Bom With Change number mandatory

Hi I have made setting in OS25 and OS27 for making Change number mandatory. Also i changed authorization object C_STUE_NOH ="  ". Now Change number is mandatory in CS01, But it should me mandatory for...

View Article

Re: KANBAN Cut over activities

Hi Friends, I came to know the solution on my own, here is the approach The initial stocks for the KANBAN manufactured parts at cut off date will be loaded to SAP as per IM methods. for the first time,...

View Article


Image may be NSFW.
Clik here to view.

expected yield variance value after confirmation cancellation.

Hello Guys, I Could like understand system behavior  step-1 created production order qty-2step-2 confirmed operation 10- qty-1-saved  counter-1step-3 confirmed operation 10- qty-1-scrap-saved....

View Article


Re: How to create demand planning for Configurable materials

Hi Sapients, Waiting for the Reply. Thanks in advance Regards,Hemanth.

View Article


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>