hi,
Is it possible to activate Engineering change management for ROUTING at PLANT level??/
I mean There are many plants. Plant with 15**; 60**, 40**, 50**
I wanted to activate ECM for change of routing only for plants 15**
If it is possible can pls share the configuration steps???
I already activated ECM for only routing change. At plant level to be done.
Pls help me.
Thanks in advance
rgds,
VKumar A