Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 2633 articles
Browse latest View live

MF60 - Production Order # is not appearing

Hi, When i try to execute MF60 by entering Production Order #, the component relevant for staging appears but the Production order is missing here. Please refer the attachment for more details. Request...

View Article


Re: Scheduling Automation in CM25

Still I am facing 3rd Point i.e How do you get it to be dispatched I see the order goes to splits but they are not dispatched and still are in the orders pool of not dispatched orders.Orders...

View Article


Convert to planned order to process order in md04

Dear Friends,  In md50 Mrp run against sales order  planned order been generated.While convert to planned to process order I am facing this error.Please find the error screen shot and suggest me how to...

View Article

Re: Convert to planned order to process order in md04

Hello Did you already research for old threads with the error message? I have already answered this question several times on SCN. You should take a look on the following threads: You cannot make an...

View Article

Re: MF60 - Production Order # is not appearing

Hello Do you see the order number on the reservation record on table RESB? BRCaetano

View Article


Re: Special procurement key 40?

Dear Dharma Sir,I have got the process of how the special procurement key 40 is to be used.Question 1- I want to ask is what is the use of transaction VL10B while working with special procurement key...

View Article

routing group counter

Hi, Can we assign common group counter to common routing group.  Say for example if one material code A0001 has routing group as 50000001 with group counter as 1 and other material code A0002 has...

View Article

Re: routing group counter

Sun,It sounds like you are improperly using the create mode.  Instead, you should go into the existing Routing Group, with the Group Counter 1, in change mode, and then assign the additional material....

View Article


Re: Run time abap error

Hello As already mentioned by Mariano, you need to provide us more details about the short dump.  Please attach the complete short dump file into this thread. If you display in ST22 the dump you can...

View Article


Re: SD-QM-PP issue regarding Reference Operation Set

Hello You can create a routing with reference to a sales order, so that it can be used on a MTO production order that is linked to this sales order. The same logic is valid for a reference operation...

View Article

Re: Export order Sales - MAKE TO ORDER

Hi Pedro,  It is not recommended to change the quantity of the sales order to match the quantity that was delivered. Suppose that you have a sales order (MTO) for 2000 PC of your product, the planned...

View Article

Re: Export order Sales - MAKE TO ORDER

Hello Pedro From a PP point of view, as long as the quantity is open on the sales order, it will still be considered by MRP and displayed as open on transaction MD04. You should try to close the sales...

View Article

Re: Material is blocked for single item planning error message in SM58 for...

Hi,I think similar problem on topic billing block (VA01) and MD04 planned order 52 (No BOM Selected) . I shared information about the last message this topic. (snote)outside the MRP, VA01 and VA02...

View Article


Re: SD-QM-PP issue regarding Reference Operation Set

Hello Caetano, Thanks for your reply. So i understand that is useful for MTO process. In fact, that's what i'm looking for. But my issue is rather related to QM. I'm trying to auto select QM operation...

View Article

Re: SD-QM-PP issue regarding Reference Operation Set

Caetano, Could you please help me to create routing with reference to sales order ? Because we don't have sales document field in CA02/QP02. Thanks

View Article


Re: Planning strategy 40

HelloThis is the correct system behavior for planning strategy 40. The PIR quantity is used to plan your material in advance, that means, to plan when there is no sales order. When a sales order is...

View Article

Water as a material at 0 cost

Dear experts, For a new manufacturing process, the business requirement is to have water created as a material at cero cost, with QM active (so quality inspections can be created) and to be able to...

View Article


Re: Production Order Scheduling Basic start date in the past

Hi DB, Thanks for the reply.I checked my OPU3 settings and it is set to 2 already which is "Adjust Basic dates, adjust Dep. Rqmt to Order start date". Is there any other config I am missing?? - AK

View Article

Re: Demand Vs CRP Vs Bottleneck Resource

Dinesh,In finite and infinite scheduling, the system extends the time of planning based on the quantity to be produced. Is this statement is right ?The duration of the order depends upon the formula...

View Article

Image may be NSFW.
Clik here to view.

Re: Production Order Scheduling Basic start date in the past

AK,???? I don't know what version of SAP you are working on.  Here are the standard settings from just about every SAP system I have ever worked on, going back as far as R/3 3.0H Clearly 2 and 3 say...

View Article
Browsing all 2633 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>