Production BOM change automatic notification to costing team.

Hi, Once i changed the production BOM, How costing team gets automatic notification that BOM has been updated/changed? So that costing team again re-run/re-cost the BOM... Regards,Santhosh.

View Article


Some parts in the BOM are not updating/showing in costing structure BOM...

Hi, Some parts in the BOM are not updating/showing in costing structure BOM eventhough after its ran for costing BOM, please suggest me what i'm missing? Regards,Santhosh.

View Article


Re: Production Order Scheduling Basic start date in the past

Yes I found it. Let me do the changes and test again. Will revert after the test. Thanks DB

View Article

Re: Demand Vs CRP Vs Bottleneck Resource

Hi Sir: I want to add few more points on my requirement. As i said earlier "The system extends the time of planning based on the quantity to be produced". This is logically Ok, since both are...

View Article

Re: Posting of MFBF Failed SAPLBARM 0171

Are you processing MFBF in background if yes you can have a problem in the BOM components.Check if the BOM assignment is correct Check if on MRP view and check if the components have assigned the...

View Article


Re: Some parts in the BOM are not updating/showing in costing structure BOM...

Hi,  Maybe the problem is the Qty Structure Date defined during the costing run.When you run product costing, you have to indicate what is the validity date to read the structure of your product.Could...

View Article

Re: EDITING PLAF TABLE

Hello,  For such changes you will have to create a LSMW or use Script Recording and Playback.I recommend the Script, since you probably don´t have authorization to create and run LSMW: Script Recording...

View Article

Re: Production BOM change automatic notification to costing team.

Hi Marino, Thanks for the reply... Yes right, but system has to consider the new price only right...Where i can check the variances? any t-code for that, please suggest. Regards,Santhosh.

View Article


Re: EDITING PLAF TABLE

Table editing is never a good option.But if you want to know how to edit a table you can use SE16N_INTERFACE function module with parametersI_TAB = PLAFI_EDIT = XI_SAPEDIT X

View Article


Re: Some parts in the BOM are not updating/showing in costing structure BOM...

Hi Mariano, Thanks for your time to given me the reply. We are not changing any dates, when i enter the t-code, it automatically shows todays date, we put the part no. and execute it, then also it...

View Article

Re: Production BOM change automatic notification to costing team.

Hi Santhosh,  You can see the variances in the production order or process order.Goto --> Cost --> Analysis The execution will be done according to the new BOM and you will have variances since...

View Article

Re: Capacity Requirement using finite scheduling

Hi Raghuram,  You can schedule automatically an order upon creation, but I don´t think you can re-schedule the orders previously scheduled automatically. At least I don´t think it is possible in SAP...

View Article

Re: Production BOM change automatic notification to costing team.

Hi Mariano, I'm an end user, so please suggest me the t-code, or path menu... Regards,Santhosh.

View Article


Zero records converted in RMCA9155

Hi Experts,I am trying to execute program RMCA9155 for MPS process, to Copy and Delete version 000 to a Week  Source info structure           S901Source version                  000 Target info...

View Article

Re: Production BOM change automatic notification to costing team.

Hi Santhosh,  You can access the production order with t-code CO03. Then follow the menu:Goto --> Cost --> AnalysisI suggest to search before posting question that you can find for your own in...

View Article


Re: Order scheduling in MTO scenario

Hi Eric,  First Check -  master recipe time, if are the same in the two plants For your process, what are planning strategy that you use for this material ?  for both plants... What are you using as...

View Article

Re: CS12 Currency Overflow DUMP

Hi David,  Do you executing CS12 with requerity quant ? what?   What is the quantity of this component in the BOM ?   What is the PRICE UNIT of this material ?  What is the Price of this material ?...

View Article


Re: End Month financial closure period very long

Hi  I saw the same problem (many years ago....), We did two things:   1) Put status CLOSED... Because The orders were "good" (produced with them)   2) If we create the orders, but not execute (we do...

View Article

Re: Order scheduling in MTO scenario

Hi Dimas, Both recipe in plants have same time in recipe. Strategy - 86 Schedule margin key - 000 (It's same in both plants)

View Article

Planning Calendar

Hi, In MD04 under period total view, when i clicked on Planning Calendar tab, got the following error, "Error determining planning periods for calendar 001 - Message no. 61123" Actually to this plant...

View Article