LTP planned order to be created with different order type
Hi All, I need your suggestions to differentiate the simulation planned order and the operative planned order. At this moment the simulation order type is same as the operative order type after running...
View ArticleRe: LTP planned order to be created with different order type
Hello It is not possible to create a new planned order type. The planned order type is automatically determined by MRP, depending on the planned order purpose. For example, for example external...
View ArticleRe: Scheduling Automation in CM25
Hello I suggest you to take a look on the following document: CRP Basic Settings part 4 - Running Capacity Leveling in Background BRCaetano
View ArticleRe: Creating planned orders during MRP run
Hello Thank you for the update. If the issue is solved, please close the thread. BRCaetano
View ArticleHow Scheduling parameter start date in the past to be set for X days
Hi All,The planner is making the production schedule in ABC planning tool and transfers this to SAP.On a daily basis the planning is reviewed and rescheduled to the actual production. With the...
View ArticleRe: IN COR6N t.code Need to change 15 actual activity
Dear Prem, Thanks Lot for reply, its working Fine while enter the one operation, but second operation like 0030 does not take it ,It will take default as 0020 operation. I want to change the activity...
View ArticleRe: IN COR6N t.code Need to change 15 actual activity
Hi, You need to confirm the operations one by one. Once you confirm 0020, try the remaining operations step by step ThanksPrem
View ArticleRe: IN COR6N t.code Need to change 15 actual activity
Dear Prem, Super it working Thanks lot..... If I change the second operation yield qty what is the impact of activity qty &priceEx 1 operation yield qty was 100 . 2 operation yield qty I have...
View ArticleIndustrial waste material treatment process mapping in PP
Hello....Experts. I want to map industrial waste material treatment process in PP for my client along with CO.Client has a requirement for process based costing. The waste is received from different...
View ArticleRe: data table for mmbe
Check tables MARD, MSKA, MSKU, MSPR for unrestricted-use stock. Fields are MARD-LABST MSKA-KALAB MSKU-KULAB(Customer Consignment) MSPR-PRLAB Regard'sasim
View ArticleIssue with GR Qty - Batch Specific UOM
Hi, I am facing problem while posting Goods Receipt for Raw Milk in Liters as the KG equivalent is not getting derived properly. For raw milk stock keeping unit is KG and receiving unit is liters....
View ArticleRe: Issue with GR Qty - Batch Specific UOM
Hi Anil, The batch specific UOM is maintained as 100 KG / 103 L = 0.971 KG/L.Instead, the first screenshot shows you have Plan value as 1.03 KG/L. This is incorrect.So, as per the settings, you are...
View ArticleRe: Issue with GR Qty - Batch Specific UOM
Hi Prem, The Plan Value refer to Raw Milk Batch Density which the QA team will define as one of the Characteristic value. If i am making a GR for 100 litres (at Density = 1.026 KG/L) it should create a...
View Articleindividual capacity update automatic
hai friends, I have booked 4 individual labor capacity of one work center to particular prod order for next day. The next day one person not came client required automatic update on absence need...
View ArticleRe: individual capacity update automatic
Chaitanya,I don't know exactly what your client wishes to automate. I hope he does not expect that SAP has some magical way to detect that an employee is missing, and then automagically reschedule the...
View ArticleRe: URGENT:UNABLE TO DO GOODS ISSUE IN MIGO
Hi Phani, Go to the order to the components tab, check if you have checked the Final Issue indicator for each component. If this is the case, remove the flag and save. Kind Regards, Mariano
View ArticleRe: To copy the component assignment
Hello Brahmankar! Thanks for your reply. About the CEWB, I can't to do copy any material because the field is disabled.On the picture last and next, you can see that the field doesn't allow that I...
View ArticleRe: Issue with GR Qty - Batch Specific UOM
Hi Prem/Amaranth, This issue is fixed now, I have maintained the required config setting @ Define Calculation of Base Quantity from Proportion Quantity under Batch Management. Thanks for your...
View ArticleRe: Material is blocked for single item planning error message in SM58 for...
Hello Mastan, You need to check what this user INT_MM01 is doing. It might be trying to edit a sales order at the same time when MRP job is running, which is causing a lock. RegardsAbhishek
View ArticleRe: To copy the component assignment
Hello, Please check the work area in OP77 Component assignment tick is active.Also check the by implementing SAP note 1539919. Best Regards,R.Brahmankar
View Article