Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 2633 articles
Browse latest View live

MD12 badi or user exit for delete any planned order with control

Hi everyone,  I want to put custom control while deleting planned order in MD12  but ı couldnt find any exit for this deleting event?  Any help will be appreciate.  thank u best regards.

View Article


Re: MD12 badi or user exit for delete any planned order with control

Hello Check the document http://scn.sap.com/community/erp/manufacturing-pp/blog/2013/08/12/badis-for-mrp. Here you will find BAdIs for the planned order.  BRCaetano

View Article


Image may be NSFW.
Clik here to view.

Re: MD12 badi or user exit for delete any planned order with control

Hello Kutay, Merry Christmas  I did not any user exit when I click on Delete from MD12. Strangely I could not get any BADI as well, but I am not sure if any BADI exists. However I find one BADI,...

View Article

Re: MD12 badi or user exit for delete any planned order with control

Hi Beri, Firstly thanks for your quick respond and merry christmas to u. Actually Im using BADI, MD_PLDORD_CHANGE for another controls and ı tried to stop deleting event with some specific condition...

View Article

Re: MD12 badi or user exit for delete any planned order with control

Hello Kutay, I am afraid I could not find any other exit or BADI. Can you handle the issue in a different way instead ? Remove planned order delete authorization for all users and develop a custom...

View Article


Re: MD12 badi or user exit for delete any planned order with control

Thank u Beri im gonna search for another solution..

View Article

Image may be NSFW.
Clik here to view.

Re: MD12 badi or user exit for delete any planned order with control

Hi, Your welcome, in case your query is answered request you to read  How to close a discussion and why Best Regards,Ameya B.

View Article

After MRP run in MD02 not generating schedule lines ,it crates PR

Hi Greetings, After  MRP run in MD02, it is not generating scheduling agreement, it creates Pur.requisition, All parameters are correct, last month it created properly, what could have happened this...

View Article


Material Requirement Planning for Similar Raw materials

Hi All I have similar kind of raw materials which are used in different FG/SFG BOMs. These raw materials are alternative to each other, so I want to run MRP for all these raw materials and total...

View Article


Undelete the item from BOM in production order.

Hi Experts,Is there a way to "Undelete a item from BOM ?, We have deleted item in BOM from one production order.Can I re-vitalize the BOM item again?we cannot seem to find a option to do this.Please...

View Article

Undelete the item from BOM in production order.

Hi Experts,Is there a way to "Undelete a item from BOM ?, We have deleted item in BOM from one production order.Can I re-vitalize the BOM item again?we cannot seem to find a option to do this.Please...

View Article

Re: Undelete the item from BOM in production order.

Hi, as I understand, you have deleted a component assigned via BOM to a production order. I assume from what you wrote above that you want to consume this item also against the production order... if...

View Article

How to get the process time value Uom in Afvv table.

Hi,I need a small information. My Requirement is i would like to get the process time of the Operation. What we are entering at Routing. For this i had choose the table AFVV Table.  Process time field...

View Article


Re: After MRP run in MD02 not generating schedule lines ,it crates PR

Hello  Maybe it's a source list validity problem. Check if there is a valid source list entry with reference to a valid agreement.  BR Caetano

View Article

PR will be generated after considering own stock + Jobber Stock

Dear Expert,  We make a production through sub contracting . we send component material to jobber for FERT production , some of the time some stock lying with jobber , that is reflected in MD04 list...

View Article


Re: PR will be generated after considering own stock + Jobber Stock

Hello, How do you send the components for subcontracting ? Do you issue them to a virtual storage location ? If yes check if that storage location is included in MRP or not. Best Regards,Ameya B.

View Article

Re: Problems with confirmation Cancelling with CORS

Hello Carlos, Do you see any failed goods movements when you cancelled the confirmations ? Best Regards,Ameya B.

View Article


Re: Undelete the item from BOM in production order.

Hello, Now since you have already delivered the order the option is to post an unplanned consumption against the order using 261. If you would have detected this earlier, below function may have been...

View Article

Re: How to design the process order in this scenario?

Hello If you don't know the components in advance, you must add them manually on the process order.I suggest you to add all the components before releasing the order, so that you can avoid any action...

View Article

Re: cs11 not showing negative quantity for scrap or weste material.

Hi Chetan, CS11 will show all the components which are in BOM.Check layout setting at output, whether default layout is only showing quantity greater than zero. Regards,Amarnath Dube

View Article
Browsing all 2633 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>