Hi All
I have similar kind of raw materials which are used in different FG/SFG BOMs. These raw materials are alternative to each other, so I want to run MRP for all these raw materials and total requirement to be displayed in that any single raw material.
I have tried planning with planning material in MRP3 view and given strategy group 60. However planning is done in individual material codes and not in single material.
Please suggest how can I run MRP in single material.
Thanks & Regards
Shripal Bhavsar