COOIS data format
Hi PP experts, When I download the data from COOIS, there is a little difference between Excel file and .txt file. Could you please help to check the question mark in material description? Excel file:...
View ArticleRe: Changing the BOM daily - Food Catering Business
HI Kumar Try to map these scenario with Variant configuration by creating Super Bom .By creating object dependency Hope it will reduce complexity Regards Virender
View ArticleRe: Requirements in MD04
Hi, both materials have either mrp type X1 or X0. Think you should also check with your APO guys if there is somthing wrong with the masterdata in APO or with CIF-Integration. Maybe run /SAPAPO/CCR for...
View ArticleRe: Shelf Life Expiration Date & MRP
Hello As stated on the FAQ note 550568, MRP does not run on a batch level. That means, it does not consider batches or batch characteristics, such as the shelf life. You can use BAdI MD_CHANGE_MRP_DATA...
View ArticleRe: MRP control through STO
Hello There is no direct link between the STO and the production order. In addition, there is no STO special stock, such as the sales order special stock. There is a BAdI that can be used to include...
View ArticleRe: MRP - strategy 40
Hello You are using planning strategy 40 but the sales order is under the sales order special stock. Strategy 40 is a make-to-stock strategy, so this sales order is obviously not using the correct...
View ArticleBAdI ICH_BIF_WO_INF_IN (BF LOG_MM_OM_1) --> automatic confirmation
Good evening, Recently the bussiness function LOG_MM_OM_1 was activated in our sandbox to evaluate the functionality.I saw that the BAdI ICH_BIF_WO_INF_IN is available in the system. SAP states:An...
View ArticleRe: Shelf Life Expiration Date & MRP
Dear Brahmankar Thanks for your support, which was the begging to confirm that there is no way via standard. OP
View ArticleRe: Shelf Life Expiration Date & MRP
Thanks dear Caetano... I found this application more reachable for us in this moment as well as useful the rest of info contained into note referred by you. RegardsOP
View ArticleScope of Check Enhancement in ATP Check for Planned Orders ?
Dear seniors, I am looking for a way to Enhance the Scope of check in our ATP Check for Planned Order Process. We want to implement a logic for considering demand elements (Order Reservations) for...
View ArticleRe: Strategy 60 don't reduce the Ind Req.
Daniele,Strategy 60 is not really very suitable for planning SemiFinished goods. Strategy 60 forecasts are placed against the planning material. These forecasts are consumed by Sales orders against...
View ArticleRe: MRP - strategy 40
Hi Sun Riser, As was mentioned by Caetano the problem is the Requirement Type.In MD04 you can see that the system is planning this sales order as Make to Order (note that you have a Block for the...
View ArticleRe: MRP control through STO
Hi Sun Riser, If you have APO you can use the pegging relationship for this.If not, there is no link in the standard SAP. You will have to make an enhancement for this. Kind Regards, Mariano
View ArticleRe: I am getting an error "Sequence 0 operation not found in order XXXX,...
Hi.If you are not sure what fields you must send to this BAPI, try 'BAPI_PRODORDCONF_GET_TT_PROP'; just put ORDERID and OPER. This function is a good advice to know what fieldsyou must send in the...
View ArticleRe: I am getting an error "Sequence 0 operation not found in order XXXX,...
Hi Sreenivas, Please make sure that you have passed the fields correctly for the table TIMETICKETS.Refer as example below ORDERID = XXXXXXXXXXSEQUENCE = '000000'OPERATION = '0010' Thanks,Sree
View ArticleRe: Scope of Check Enhancement in ATP Check for Planned Orders ?
Hi Milton, Thanks for the info. I know about that option, but is not helping me. I am looking for system status. This is not available in customizing. We are looking at user exits and badi, so far...
View ArticleRe: I am getting an error "Sequence 0 operation not found in order XXXX,...
Hi, Thanks for your Prompt Reply.My problem is resolved. Regards, Sreenivas
View ArticleRe: I am getting an error "Sequence 0 operation not found in order XXXX,...
Hi Sree, Thanks for your reply.My problem is resolved. Regards,Sreenivas
View ArticleSOP : FLEXIBLE PLANNING
Hi, I working with FLEXIBLE PLANNING for the first time and i'm supposed to follow the below steps in sequence.Steps: 1) Create Info structure MC21 : I copied from an existing Info structure S621 and...
View ArticleRe: SOP : FLEXIBLE PLANNING
Hi, Check the below document and follow as per the steps mentioned in the document. Flexible Planning in SOP process flow... ThanksKumar
View Article