Re: How to restrict BOM explosion for a particular production order type ?

Thanks for the reply Gobinath. I did what you have said but didn't get the result. Still asking for BOM explosion during production order creation.

View Article


Re: How to restrict BOM explosion for a particular production order type ?

I think you should define bom application as per your requirement , and assign this application in order type dependant parameters.

View Article


Re: SOP : FLEXIBLE PLANNING

Hi, I tried with your doc but could proceed with that tcode. Since this is first time access those codes. Activate the info structure – MC22 is just change mode of MC21. How to activate the info...

View Article

Image may be NSFW.
Clik here to view.

Dependent goods movement was incorrect for collective order

Hello PP Experts,I was testing collective order scenario with the help of this linkhttp://scn.sap.com/docs/DOC-39167While doing confirmation for child orders in CO11N i am getting this errorPlease help...

View Article

Re: SOP : FLEXIBLE PLANNING

Create info structure – MC21Activate the info structure – MC22Assigning the planning parameters to the info structure. – MC7FCreation of Planning Hierarchy – MC61Creation planning type and Macros-...

View Article


Serial number issue-Production order release-PPRL

Hi experts, The serial number issue is seems to be very strange.Number range has been maintained only for equipment category " S".Equipment number range interval : From number : 000000000000000001 to...

View Article

Re: Serial number issue-Production order release-PPRL

attached the already released sample production order screen with serial number.

View Article

Re: MRP not happening through MD01 but executed through MD02

Hi Kumar Check the blog What can I check if MRP does not plan a material?One of the causes described on the blog is specif for Retail. BRCaetano

View Article


Re: Dependent requirement only if superior assembly is dispatched to line

Hello There is no such functionality to make the dependent requirements available for planning only at a specific point in time. However, you can implement your own logic to make dependent requirements...

View Article


Re: Dependent goods movement was incorrect for collective order

Hello When posting a confirmation for a child collective order, both goods movements will happen together, the goods receipt of the child order and the goods issue for the parent order. It looks like...

View Article

Re: Oldest Planned independent requirements to be consumed

HelloAs I pointed previously, this is the only BAdI available to influence the PIR consumption.BRCaetano

View Article

Re: Dependent requirement only if superior assembly is dispatched to line

Caetano, currently what we do is 1. we have 2 boms for the header material, one with no components with prod version 0001 and other with real compoents with version 00022. mrp runs and selects 0001...

View Article

Re: Release date issue in PR without Material

Dear Aravind, Is PMEX your defined custom control key ? In standard I see PM02. Check if the Indicator: Scheduling external op. with standard values is set,   As per SAP help, "If the indicator is not...

View Article


Re: How to restrict BOM explosion for a particular production order type ?

Hello, In that case you need to use some BADi like WORKORDER_UPDATE or user exit. Best Regards,R.Brahmankar

View Article

Re: Default Values for T-code MD15

Hello The value for this parameter is not read on MD15. You can have a default value set for this field if you define it on the material master. Best regardsCaetano Almeida

View Article


Re: Serial number issue-Production order release-PPRL

Yes ,we have tried create in IQ01/IQ04, but same error is coming.Already Serial Number Existence Requirement in  OIS2 Check Box has removed.Find the work scheduling View attachment

View Article

PRT and MRP

Dear Gurus, Is there any way to generate planned orders, through MRP, for PRT ? For example : A production order is created, with an operation that need 40 quantities of a PRT (Procured externally,...

View Article


Re: Serial number issue-Production order release-PPRL

Hello,  The checkbox ExtReq. if marked signifies that the serial numbers must be precreated to be used. OIS2 for Serializing  procedure PPAU & PPRLuse Serial usage 02 & 04 respectively.Try by...

View Article

Re: MD04 Screen - Available quantity field greyed out

Dear Bramankar, Yes, Behaviour in quality server is working fine as per SAP standard. It is showing 0 in MD04 bcoz there is no stock in MMBE. But the material in development MD04 is greyed out...

View Article

Re: MD04 Screen - Available quantity field greyed out

Hello, Do you have same behavior for all the materials in development system?And BAdi for MRP is active check the same? Best Regards,R.Brahmankar