Quantcast
Browsing all 2633 articles
Browse latest View live

Re: No more simulative orders generated

Hello Please implement the following note on your system and test this scenario again: 2256211Different planning results using MS01 or MSBT and MS02  Best regardsCaetano Almeida

View Article


Re: Same material in multiple workcenters

We can maintain a machine(P) as group machine which is group of A,B & C. Then you would be maintaining a single routing for the product X.   Best Regards,  Radheshyam P. Message was edited by:...

View Article


Re: Error in CS14 comparison

Hi Laura, Please check the BoM for material 2013719. It is in this BoM, that 2013721 is listed. Check the QTY of 2013721 in both usage's 1 & 2. Also check if the QTY is 'Fixed QTY' in production...

View Article

Re: Work Center - Make fields not mandatory

Hello See the information below provided on note 352485: Screen and field selection In transaction OP13 or OPFA, the screen and field selection are set for each work center category. In transaction...

View Article

Re: Usin bapi BAPI_PRODORDCONF_CREATE_HDR material document number going to...

Hello If I understood the description of the issue correctly, you are observing exactly what is described on the note on your system: there are different material documents for the goods receipt and...

View Article


Re: MRP with re-order planning

pls suggest

View Article

Re: Complex Bill of Material

Dear Expert, As I early mentioned in my post they have approximately 80k components/ items in the single finish product (i.e. Van, Cars, Helicopters, aircraft, airplane etc.) BOMs and these 80k...

View Article

Re: Usin bapi BAPI_PRODORDCONF_CREATE_HDR material document number going to...

Hi Ceatano,I want to confirm production order by using BAPI. Please help me which BAPI i have to use and what are the needed fields .I am totally new in pp module please help me. Regards,Suman

View Article


Image may be NSFW.
Clik here to view.

Re: Production Order Change - New Batch Determination

Hi Brahmankar, Not sure if I can reply your answer two weeks later. However, I'd like share screenshots for better comprehension. Production order was originally released for a total qty of 5.000 and...

View Article


Re: BAPI_MATERIAL_BOM_GROUP_CREATE / COST_REL not empty

Hello The BAPI considers the default values from table T416V when the following fields are empty: prod_rel    SANFEeng_rel     SANKOcost_rel    SANKApm_rel      SANINspare_part  ERSKZsales_rel   RVREL...

View Article

Image may be NSFW.
Clik here to view.

Re: BAPI_MATERIAL_BOM_GROUP_CREATE / COST_REL not empty

Thank you very much Caetano !

View Article

SAP VC Production Order Creation for KMAT Material

Dear Team, I am trying to create production order in CO01 for  KMAT (material type) material. But it is asking for sale order. Is it mandatory that to create the production order, the sale order is...

View Article

Business Object for Transaction MC81

I can't find the Object in the BAPI Explorer for MC81. For Transaction MD61 (Planned independent requirements) the Business Object BUS3027 exists and offers the following methods:*...

View Article


Re: SAP VC Production Order Creation for KMAT Material

Dear               We worked in a vc senerio where Requirement is mandatory and it is created through MD81(CIR) .

View Article

Re: Business Object for Transaction MC81

Hi, Check enhancement: MCP20001  (exit: EXIT_SAPMMCP6_001) Dimas Faria

View Article


Re: Production order Setup time and Machine time

Hi Amarnath, AFVV is the right table but I found the following fields which I am using, Setup time - AFVV-RUESTSetup UoM - AFVV-RSTZEM/c time or Processing time - AFVV-BEARZM/c UoM or Processing UoM -...

View Article

For REM CM01 displays no capacities found

Hi Experts,For REM scenario I got many planned orders by MPS run, But in CM01 the Capacity details/period shows "No capacity requirements have been found for the selected periods", for all periods. Is...

View Article


Re: For REM CM01 displays no capacities found

Hello Make sure that you are running lead time scheduling for your planned orders. You can do it by running MRP with parameter scheduling = 2 or manually scheduling the planned order on MD12. Also,...

View Article

Re: Load Routings with multiple operations into SAP R/3

Hi MS Use bapi: bapi_routing_process. With this bapi it is possible to add operations to existing routings.If error: Header cannot be locked appears, you must put a flag equal to x. Must make debug to...

View Article

Material master in Sales Order translates to different Material master in plant

Looking for easiest way for Sales Rep to capture a Material Number in the sales order, but that automatically translates to a different material number for the Fin Good in the plant. Can we use a...

View Article
Browsing all 2633 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>