Import and launch capacity leveling data from a legacy system

Hi, We are facing a situation with our customer where I would need your help. This process is as follow: Sales orders are created in SAP.MPS is triggered manually, creating planned order with capacity...

View Article


Re: Firmed Planned order on LTP

Hello Caetano, Thanks you for your help. Issue has been resolved. I actually didn't run LTP for the other plant. PLOREL is getting displayed on MS04 now. Appreciate your time.

View Article


Copying Alternate Sequences Containing Data from Standard Sequence

Hi, The facility I work at produces rubber parts. We have many groups of identical machines. The only difference between the machines is the work center name. Currently we have our SAP system routing...

View Article

Re: Operations dependencies on Routing

Hi Brahmankar, your advise was helpful, but still had to add one more step: In OP00 maintain confirmation required for the  control key used in the operation.

View Article

Image may be NSFW.
Clik here to view.

Re: Release Order - Production order with automatic batch

Hello Chandra, I will take that into account  BR,Bruno Tiago

View Article


SOP Flexible planning ratio units.

Hello everyone, I want to know if there is possible to create an infostrucute with ratios in different units.  I´ve create the infostructure for planning with trx MC93/MC94 but the unit is ***.  The...

View Article

Overcapacity color in CM01 can be changed ?

Dear seniors, In CM01 the overcapacity is displayed with a RED highlight. Do you know if that color can be changed to something else ? Thank you,Alex

View Article

Re: Operation Base Quantity Change in Routing (different value for different...

Hi Mariano, I checked both the method to achieve my task, in both case it worked partially and i face same problem also, i have 2 operation in routing, by both method i am not able to get base quantity...

View Article


Materials uploading in equipment BOM

Hello to all, I want to upload the newly created spare parts materials in the equipment BOMs in mass.Already there were materials existed in BOMs.But deletion flag has been set by the client for these...

View Article


Re: Equipment PRT with stock

Dear Velmurugan, I am able to track stock serially. But for tracking usage how its to be done?Ex. I have one PRT having three multiples (3 serial nos.) Now at the time of confirmation how to capture,...

View Article

Re: Materials uploading in equipment BOM

Hello You should use LSMW to do that. There are several threads and documents explaining how to create an LSMW for BOMs. BR Caetano

View Article

Purchase requisition and planned order as MRP result.

Dear gurus, i would like to know if there is a way to create both purchase requisition and planned order in MD04 result of MRP run.  For example i would like to optain purchase requistions for the...

View Article

Re: Purchase requisition and planned order as MRP result.

Daniele,Use Procurement type 'F'. Create a Schedule Margin Key with an opening period of 1 month (OPJZ).  Place that Schedule Margin Key in the Material Masters where you want this behavior.Run MRP...

View Article


Re: Confirmation operations of production order

Hi Alex,  1) Within the routing you put quantity / hour. Look your routing. If you modify the routing, you'll have to create another order or read PP master data in the existing order. 2) Within the...

View Article

Re: Backflush Issue, some quantities did not consume

Hi,  How are you doing backflush ? tcode ? Check the stock is doing the backflush you got the point 1? Regards Dimas Faria

View Article


Re: Equipment PRT with stock

Hello Using user status for equipment ,you can track the usage.To set this user status,we need to use user exit. Regards,Velmurugan S

View Article

Re: Error in routing creation

Hello,   You have to maintain relation between Cost center activity as activity rate in KP26. Using this system will calculate  activity cost for that operation. Regards,Velmurugan S

View Article


Image may be NSFW.
Clik here to view.

Re: Overcapacity color in CM01 can be changed ?

Hello Alex, I think this can be done though red is normal color customers prefer for overload, have you gone through the below threads ? Colour Coding for capacity planning Capacity planning issue...

View Article

Re: Subordinate order in collective order

Hi Anuj, Yes it would work if you know the orders and which is the superior order for a current order you could reconstruct the whole collective order tree. Please develop this custom logic with help...

View Article

Re: Set BOM creation from Engineering BOM

Hi, What do you mean by "I will buy loose"? and what is not happening for you? is your BoM not formed proper or is the requirement not being generated for some items? Thanks,Madhu