Import and launch capacity leveling data from a legacy system
Hi, We are facing a situation with our customer where I would need your help. This process is as follow: Sales orders are created in SAP.MPS is triggered manually, creating planned order with capacity...
View ArticleRe: Firmed Planned order on LTP
Hello Caetano, Thanks you for your help. Issue has been resolved. I actually didn't run LTP for the other plant. PLOREL is getting displayed on MS04 now. Appreciate your time.
View ArticleCopying Alternate Sequences Containing Data from Standard Sequence
Hi, The facility I work at produces rubber parts. We have many groups of identical machines. The only difference between the machines is the work center name. Currently we have our SAP system routing...
View ArticleRe: Operations dependencies on Routing
Hi Brahmankar, your advise was helpful, but still had to add one more step: In OP00 maintain confirmation required for the control key used in the operation.
View ArticleRe: Release Order - Production order with automatic batch
Hello Chandra, I will take that into account BR,Bruno Tiago
View ArticleSOP Flexible planning ratio units.
Hello everyone, I want to know if there is possible to create an infostrucute with ratios in different units. I´ve create the infostructure for planning with trx MC93/MC94 but the unit is ***. The...
View ArticleOvercapacity color in CM01 can be changed ?
Dear seniors, In CM01 the overcapacity is displayed with a RED highlight. Do you know if that color can be changed to something else ? Thank you,Alex
View ArticleRe: Operation Base Quantity Change in Routing (different value for different...
Hi Mariano, I checked both the method to achieve my task, in both case it worked partially and i face same problem also, i have 2 operation in routing, by both method i am not able to get base quantity...
View ArticleMaterials uploading in equipment BOM
Hello to all, I want to upload the newly created spare parts materials in the equipment BOMs in mass.Already there were materials existed in BOMs.But deletion flag has been set by the client for these...
View ArticleRe: Equipment PRT with stock
Dear Velmurugan, I am able to track stock serially. But for tracking usage how its to be done?Ex. I have one PRT having three multiples (3 serial nos.) Now at the time of confirmation how to capture,...
View ArticleRe: Materials uploading in equipment BOM
Hello You should use LSMW to do that. There are several threads and documents explaining how to create an LSMW for BOMs. BR Caetano
View ArticlePurchase requisition and planned order as MRP result.
Dear gurus, i would like to know if there is a way to create both purchase requisition and planned order in MD04 result of MRP run. For example i would like to optain purchase requistions for the...
View ArticleRe: Purchase requisition and planned order as MRP result.
Daniele,Use Procurement type 'F'. Create a Schedule Margin Key with an opening period of 1 month (OPJZ). Place that Schedule Margin Key in the Material Masters where you want this behavior.Run MRP...
View ArticleRe: Confirmation operations of production order
Hi Alex, 1) Within the routing you put quantity / hour. Look your routing. If you modify the routing, you'll have to create another order or read PP master data in the existing order. 2) Within the...
View ArticleRe: Backflush Issue, some quantities did not consume
Hi, How are you doing backflush ? tcode ? Check the stock is doing the backflush you got the point 1? Regards Dimas Faria
View ArticleRe: Equipment PRT with stock
Hello Using user status for equipment ,you can track the usage.To set this user status,we need to use user exit. Regards,Velmurugan S
View ArticleRe: Error in routing creation
Hello, You have to maintain relation between Cost center activity as activity rate in KP26. Using this system will calculate activity cost for that operation. Regards,Velmurugan S
View ArticleRe: Overcapacity color in CM01 can be changed ?
Hello Alex, I think this can be done though red is normal color customers prefer for overload, have you gone through the below threads ? Colour Coding for capacity planning Capacity planning issue...
View ArticleRe: Subordinate order in collective order
Hi Anuj, Yes it would work if you know the orders and which is the superior order for a current order you could reconstruct the whole collective order tree. Please develop this custom logic with help...
View ArticleRe: Set BOM creation from Engineering BOM
Hi, What do you mean by "I will buy loose"? and what is not happening for you? is your BoM not formed proper or is the requirement not being generated for some items? Thanks,Madhu
View Article