Re: Independent requirement reorganization with allocated quantities

Hi Pierre Thank you for the feedback. You can keep the thread open and close it whenever you think that the issue is solved.RegardsCaetano

View Article


Open PO if Cost Center changes in Work Center

Hi E

View Article


Re: mrp area

Hello Planning WIthout Final Assembly cannot be used under a storage location MRP area, so it is always displayed under the plant stock segment.The following note describes this system behavior: 545327...

View Article

Re: Target cost not calculating in some production orders

Hi, Yes Cost Component Structure is activated and we are using make to order scenerio and in material master standard cost is maintained.

View Article

Operation Base Quantity Change in Routing (different value for different...

Hi, After searching for hours, i found many threads on how we can change task list, work center, control key etc, and also found how we can change operation base quantity if its same for all the code...

View Article


Re: Operation Base Quantity Change in Routing (different value for different...

Hello   I advice you to create LSMW to change the base quantity as you have different base quantity for Operations. Regards,Velmurugan S

View Article

Re: Operation Base Quantity Change in Routing (different value for different...

Hi Pratik,  You have different options:1- You can create an LSMW: this is the common tool used for data migration. It is fast, but it is not so common to provide access to LSMW to common users (this...

View Article

Re: mrp area

Hicheck these.. 1. You need to maintain the special procurement key for the phantom Assemblyin the MRP 2 View of the material master 2. If a Bom item is a phantom assembly , the dependent reqmts of the...

View Article


Re: Target cost not calculating in some production orders

Hello, Is it valuated sales order stock with standard cost estimate? Did you check if there was a valid standard cost estimate at the time of the creation of the order?Best Regards,R.Brahmankar

View Article


Re: Subordinate order in collective order

Hi, With the fields gave you you ride your tree And you will be able to see the order from above and below, of any order Dimas Faria

View Article

Re: Operation Base Quantity Change in Routing (different value for different...

Hello, Refer SAP KBA 1644841 - Is there a BAPI to Update Routings?You could use Direct-Input (report RCPTRA02) if you want to change existing routings.A sample data file can be created with the report...

View Article

Re: mrp area

Hi, i think.. You have maintained the material TW-0837203-00 in plant mrp area. that is there was no mrp area for specific storage location was defined for this in material master  mrp1 tab the...

View Article

Re: Where use report for all material in BOM

Hi Suresh,  I don´t think there is an option in SAP for this.You can create a Query by combining tables:- STKO, STPO, STAS, STZU, MAST Or you can create a custom report using FM: CS_WHERE_USED_MAT...

View Article


Re: BAPI_MATERIAL_STOCK_REQ_LIST

Hi,  Yes this can be done for purchase requisitions too.You can see MRP elements in table: V457T. Kind Regards, Mariano

View Article

Summarized Capacity Data in Planning Table

Is it possible in MF50 planning table to use a work center hierarchy to see summarized capacity planning data? In the 'complete capacity data' section of the planning table, I can see required and...

View Article


Re: Error in routing creation

Hello,  You have to assign the cost center to the activity type in KP26.You can see what is the activity type in the work center in CR03. Kind Regards, Mariano

View Article

Re: Where use report for all material in BOM

Hi Mariano ,  Thank you for the advice .could you give more detail on how to create query / d t code for CS_WHERE_USED_MAT ?I am totally beginner level for SAP

View Article


Re: Where use report for all material in BOM

Hi,  Check this document that explain how to create Queries:http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/10eab7af-0e54-2c10-28a5-87b47adbe1a5?overridelayout=t… In order to create...

View Article

ATP check in planned orders.

Hi,I need ATP check in planned orders to work like ATP check in process orders.I mean to confirm full available quantity of each component even another component is not fully available.Is this change...

View Article

Re: ATP check in planned orders.

Hello On the MRP group (transaction OPPR) there is a setting where you can define whether the full confirmation logic will be used for the planned order ATP check or not. Therefore, you must create an...

View Article