Re: Operation Base Quantity Change in Routing (different value for different routing)

$
0
0

Hi Mariano,

 

I checked both the method to achieve my task, in both case it worked partially and i face same problem also, i have 2 operation in routing, by both method i am not able to get base quantity with reference to operation,

 

say i created recording selecting operation 0020, even if i put operation 0010 in excel and note pad ( for LSMW) still my operation 0020 base quantity only get updated,

 

Am i missing any thing in here or it is standard behavior of the system?

 

Thanks,

Pratik.