Hi All,


The planner is making the production schedule in ABC planning tool and transfers this to SAP.


On a daily basis the planning is reviewed and rescheduled to the actual production. With the rescheduling of the process orders the finish date is leading and the start date is calculated.


It can happen that the calculated start date is within the past. ABC allows this date in the past.


But when this new schedule is transferred to SAP, the start date in the past is not allowed and SAP calculated a ‘today scheduling’, which means that the finish date is calculated again.


By doing this the differences between ABC and SAP process scheduling is created.

 

In SAP a parameter can be set that ‘start date in the past’ is allowed and even how many days in the past is allowed.


Via setting this parameter, the ‘today scheduling’ is disabled.

 

Scheduling parameter start date in the past to be set for X days:-


Plant 0000, process order type PI04, PI05. I mean is this possible from configuration level or its Customization change by using user Exist.