Dear Gurus
i would like to know if in the SOP capacity planning analysis is possibile to explode the routing multilvel in order to have the total requirement for the child of the product group.
I would like to use selection id 01 as selection rules of the rough cut plannig ( type routing N not 3)
After that i have created a product group with the following structure:
PG A:
FG1
FG2
Routing FG1
Work center WC1 time 1 h machine
Routing FG2
Work center WC1 time 2 h machine
I would like to know if possible to see in the SOP capacity analysis to see 3 h for the work center WC1 (sum) for each unit of the production plan in above quantity. I would like to avoid create a unic master routing but to use the single routing of the material level.
Thanks a lot
Daniele