Component Allocation for Alternative Sequence

$
0
0

Dears,

 

I have the following case: there is one routing with different alternative sequences, I am trying to allocate some components of the BOM to the alternative sequence but while creating the order it always allocate these components to the first operations of the sequence.

 

Example:

 

we have the following routing

 

OP010    Operation 10 in sequence 0

OP020    Operation 20 in sequence 0

OP030    Operation 30 in sequence 0

 

Alternative sequence branch operation 20, return operation 30

 

OP120    Operation 20 in sequence 1

 

we have only one component X in the bom, this item is allocated to OP120.

 

in the production order the component X is always allocated to OP010 (even if the we have chosen the alternative sequence)

 

Please note that both sequence have the same lot size setting and we are using manual exchange sequence.

 

Thanks in advance

Keroles Abader