Re: C223 - description of the BoM
Thanks Dimas. So on C223 isn't possible to have the field: BOM (STLNR)? There isn't a configuration option?
View ArticleRe: Goods Receipt of Co-Products during Confirmation
Dear Venkatesh , Thanks for the valuable input Will check as per your advice and will revert back if any issues BrTallha
View ArticleRe: Goods Receipt of Co-Products during Confirmation
Dear Brahmankar , Thanks for the info will check BrTallha
View ArticleLot Size Calculation
Hello All, I'm beginning to use the optimal lot size setting "SP" (part-period balancing) on a select list of materials. I loaded the prerequisites on the material master, and ran MRP but the results...
View ArticleRe: C223 - description of the BoM
Hi, It is possible via ABAP, but maybe not worth the effort (perhaps create a new transaction) Talk to a ABAPer Regards Dimas Faria
View ArticleRe: Handling Unit
HI, Steps:Create Packing Instructions for receiving material in POP1 t-code. (if you already didn't do this previously) Then, in Material master Basic data you have to assign the Packing Material group...
View ArticleRe: Weekly Forecast in MD63 , Requirement Date in MD04
Thanks Caetano ! I will check this.
View ArticleRe: CS12 Currency Overflow DUMP
Hi, Thank you for you support, I've change the standard cost being careful about the maximum length allowed in standard field (Field STPRS_1 Length: 11) and problem dissapear. Thank you all of you for...
View ArticleRe: Goods Receipt of Co-Products during Confirmation
Hello, Have you assigned all these co-products to your operation 0040 in routing? Best Regards,R.Brahmankar
View ArticleRe: Documentary Batch for Specific Material and Entry for Manual Process
Ok Sir, Thank You for your guidance. I will plan accordingly with my technical consultant. Thanks & Regards, Prasad Joshi
View ArticleRe: batch management precautions
Hi !!!A have done all of this steps but Batch status management is not working properly. In production tcode COR6N for Process order confirmation when we use "Batch determination" button Batch status...
View ArticleBatch status management not working properly
Hi !!!A have done all steps for activating Batch status management but it not working properly. In production tcode COR6N for Process order confirmation when we use "Batch determination" button Batch...
View ArticleRe: Lot Size Calculation
Hi, Why are you the first supply element to be 1086 pieces? Is the date of the first shortage ? Did you create the excel with the calculations? show me Please, show me:1) MD042) material master -...
View ArticleRe: Goods Receipt of Co-Products during Confirmation
Dear Brahmankar , Thanks for your advice , Issue almost 90 % solved , 1 opt has BI product A2 opt has BI product B3 opt has BI product C 4 opt has BI product D All BI products coming correctly as...
View ArticleUnable to Close Production Order
Hi Gurus, We are processing Production Order close mass processing through COHV and receiving message with "Final Invoice indicator is not set". I am fine to set this indicator manually / through BDC...
View ArticleRe: 131-132 report according to "TIME" input
Hello Kiran, SAP considers standard day setting i.e from 00:00 to 24:00 so in system it not possible to fetch data as per factory production day. You need to design separate program in which query will...
View ArticleRe: Unable to Close Production Order
Hi, Check - BS22 I0046 CLSD Closed Give double clicks on top of the item (I0046) be careful in the liberation of this restriction Regards Dimas Faria
View ArticleRe: Planned order delete pop up
Thanks Brahmankar, this message is generated from the material status
View Article