Re: How to bring the Unrestricted stock into sales order stock incase of...

Hi Brahmankar, Thanks for ur reply. I had used the HUCANC T code to bring the stock from unrestricted to sales order stock. But but  my question is I had done the GR for Production order A which...

View Article


Re: Serial Number with equipment master

HI.  my requiremen is while doing GR in MB31 the equipment to be created.  I would like avoid the step of "Activation of equipment view in IQ02".  Is it possible?

View Article


Re: Serial Number - Number Range

HI  then shal I understand as "serial numbers are at client level"?  That means if one serial number is created for one plant the same serial number can not created in another plant. Is my...

View Article

Re: Serial Number - Number Range

No Serial numbers are at Material level. Serial number repeats for each Material code.

View Article

Re: Serial Number with equipment master

I do not think so. you have to activate Equipment view separately. This is because every user might not require Equipment activation. We need to search for suitable enhancement to make Equipment view...

View Article


Restrict authorization per work center during confirmation

Hello Experts, Business wants, during confirmation (Tcode CO11N) user should only be able to confirm the operation or work center for which he is responsible. It means user should have access only for...

View Article

Semi-finished in one plant and final product in another plant

Dear Experts,            I am new to the field of production planning and am looking for guidance on a specific requirement. Client is into packaging products production (cartons) and printing. There...

View Article

Re: MD04 problem

Sitoo,You have evidently created your rescheduling horizon to behave in this way.  If you want the system to create schedule lines earlier, then you should reduce the the duration of the rescheduling...

View Article


Re: Serial Number with equipment master

HI if this is not possible automatically without development, what is the purpose of setting the configuration as "always create equipment " in OIS2 ( serial number profile config)? i Hope this should...

View Article


Re: Serial Number - Number Range

HI  Shall  I understand as below? suppose assume that I have two plants namely P100 and P200. In P100 plant I have M1 and M2 materials and in P200 plant I have M3 materia. I am doing GR for M1 and...

View Article

Re: Serial Number with equipment master

May be, I'm not sure. I didn't work with that.Also possible that this setting is relevant only upto Equipment number allotment, but not for Equipment view activation. However, If it's not achieved with...

View Article

Re: Serial Number - Number Range

Exactly ! Thus, the unique Identification of a physical material is the Material code + the Serial numberThis represents one Unique Equipment number, if one is created.

View Article

Re: Serial Number - Number Range

HI in the above example I have assigned serial number 1 to the physical material item M1 during GR. Can not reassign another serial number to the same physical material item M1 after some time?

View Article


Re: Serial Number - Number Range

You can assign different serial number not 1 again

View Article

Re: Restrict authorization per work center during confirmation

Hello Sandeep, This you will be able to achieve using on of these user-exitsCONFPP01  CONFPP02CONFPP03CONFPP04With the above exits you can arrange the exception as soon as you enter Order and Operation...

View Article


Re: Error in MFBF confirmation " Multiple assignment of line ID"

Thanks to both for your valuable reply. I had already gone through that notes, but still we are not clear on this issue. Kindly let me know if any one is having the root cause for this issue.

View Article

Re: Semi-finished in one plant and final product in another plant

Gobi, In addition to what experts have already said, you can also create a routing with work center from multiple plants. The only constraint here is that all these work centers in your routing should...

View Article


Re: Copy routing to another plant

HI Dude,Try Entering Group For Reference Then The Issue Will Be Solved Thanks and Regards,Uppalapati Jayadeep

View Article

Re: Consumption of Materials in Production Orders

Srinath, Actually, it is not possible to assign all components to last operation automatically. By default SAP will assign components to first operation if component allocation is not done. Considering...

View Article

Image may be NSFW.
Clik here to view.

How to make the termination message visible in MD05?

Hi Guru, Would you please hint me on how to make the termination message visible in MD05, please? The screenshot below is copied from SCN. Thank you so much, Sally

View Article