HI
Shall I understand as below?
suppose assume that I have two plants namely P100 and P200. In P100 plant I have M1 and M2 materials and in P200 plant I have M3 materia. I am doing GR for M1 and during GR the serial number 1 is assigned. And if do GR for M2 the same seria number 1 assigned righ? similarly if I do GR for M3 (plant p200) the same serial number 1 can assigned. Right?
thanks