Re: problem toconvert planned order into production order
Hello Venkat, work scheduling view is maintained.Production scheduler & scheduling profile is assigned,
View ArticleRe: Dismantling/Disassembly Process Discrete Manufacturing
Hello Ameya, Is this regular process of dismental the orders. CO07 is manual process however it's a good option to map such scenario. Create rework order assign header material in positive and...
View ArticleRe: Double time booking of labor hours
Hello Ameya, I have no idea how you have maintained your routing activities. If you have labour activity included in routing then you can post it through CO11N. In that case you have no need to post...
View ArticleRe: Using 551 mtype with CO11N
Hi Carol When you add a component with a negative quantity on the BOM and post a confirmation on CO11N, a goods receipt with movement 531 is posted. This is a goods receipt of a by-product, which is...
View ArticleRe: Automatic reorder point VB with only old reservation
Hello On the MRP type customizing OMDQ, you can define that MRP will consider only requirements within the replenishment lead time. If the replenishment lead time is zero, only reservations in the past...
View ArticleReason for Variance in CO11N
Dear Sir : In CO11N under quantities sub-tab "AFRUD-GRUND - Reason for Variance" field is available. Is this field is for variation in qty alone. If so, where will we enter variation in activity e.g.,...
View ArticleRe: SCN topic leader list for 2014-2015
Hello Ritesh, Thanks and Big congratulations to you too. Best Regards,R.Brahmankar
View ArticleRe: Deletion of PIR by MD74
hi caetano, can you please tell me why these PIRs 29/06 and 01/07 which have been deleted on the 22/08/2015 have taken so long to be deleted?? thank you. regards,Azhar
View ArticleRe: Single PR from MRP run
Hi Akshay, You can refer below discussions which will guide you, How to get collective requirement and genrate P... | SCN Combining multiple planned orders into single p... | SCN One purchase...
View ArticleRe: Reason for Variance in CO11N
Hi Denesh,yes it is used for it, also if you have rework or scrap then this field is used to identify the problem. you can check setting in spro > production > shop floor control > operation...
View ArticleRe: Reason for Variance in CO11N
Hello, In OPK0 for your confirmation profile you can define screen 0841 - confirmation short text and 0610 -Additional data reason. Then it will appear in CO11N and you can enter as Remark there. Best...
View ArticleRe: SCN topic leader list for 2014-2015
Hello All, Congratulations and Thanks to Caetano, Brahmankar, Kiran for sharing knowledge and helping community to improve. Ritesh, Grateful to you for sharing information.
View ArticleRe: Using 551 mtype with CO11N
Jones, I was hoping to get a material document generated with the info from the scrap qty fieldIf I understand your question correctly if you want to generate a material document with yield,scrap...
View ArticleRe: ATP Check sequence change in MDVP ?
Thanks a lot for your input. It is really helpful. Based on the tests, I have seen that I cannot go with the ORDER VIEW LAYOUT and the ORDER VIEW PROFILE in the same time. ORDER VIEW LAYOUT - I have...
View ArticleRe: To have planned order Basic start time as per factory start time
Hello SAP gurus, Could you please let me know if is possible to default the Basic Start time as 07:00 instead of 00:00 in a Planned Order or Production Order. ? Have any body done anything of this...
View ArticleRe: While creating Xstep, In order to assign the characteristics to...
Finally, I find out the answer ... The Steps for others welfare.. The Basic settings of X-Step categories, Destinations, Instructions are normally in PLANT 0001 and Z00P.1)SPRO-Process...
View ArticleRe: ATP Check sequence change in MDVP ?
Hi, Based on further tests, the Start Date is not the first parameter considered for ATP quantity commitment.If the order with start date 15 September would result in a lower confirmation factor, then...
View ArticleRe: Control recipe not getting generated due to Syntax error for CR destination
Hi Venu,Please check syntax check in operation view of CR or check PI characteristics for CR with errors.Check this link:[PP-PI] Syntax errors were found for control recipe destinationHow to do syntax...
View ArticleRe: AUTOMATIC SELECTION OF ROUTING.
Hi Dinesh, Check these links: Routing selection Settings for Routing Selection - Production Orders (PP-SFC) - SAP Library Regards,Anupam Sharma