Re: Variant configuration characteristics not enabling for material while...
Hi, In Addition to Mr. Senthil Nathan Karunanithi, There are some other ways by which we can make the characteristic value field as GREY like TABLE STRUCTURE MAINTENANCE and assigning it in...
View ArticleRe: Factory calendar
Hi Sree, I think the best way is to enter a date which lies within the validity period of the factory calendar. Please have a read of the below article on factory calendar settingsCreating...
View ArticleRe: DELETE A BATCH AFTER GR
Hello You cannot simply delete a batch. The batch is reference on material documents and the batch deletion could cause data inconsistencies on your system. The batch must be archived using the...
View ArticleRe: Single Process Order for two semi-finish material with stock updation.
Hello I think you can map the process using 101 as an intramaterial. You can post a goods receipt of this material on stock, adding it with a negative sign on the BOM of 102. Then you will include it...
View ArticleRe: MFBF - Personnel number in REM backflush
Hello Reading the BAdI documentation on transaction SE18 is always a good starting point to implement a BAdI. The documentation explains that there are 2 ways of implementing this BAdI and one of them...
View ArticleRe: CO78 - Deletion flag / Deletion indicator
Hello Make sure that the field "Delivery Date Overrun" is empty, otherwise, system does not pick up orders with a delivery date within this interval. Also, set the option "complete" on the field...
View ArticleRe: A field with updated delivery quantity in PI Sheet
Hello You should create your own characteristic to get the information from this field. BRCaetano
View ArticleRe: Rough Cut Capacity Planning on Semi-Finished
Hello You could only run RCCP for a material if there is demand created for it on SOP and, as far as I know, there is no BOM explosion on SOP. Since the actual bottleneck for the finished product is...
View ArticleBom With Change number mandatory
Hi I have made setting in OS25 and OS27 for making Change number mandatory. Also i changed authorization object C_STUE_NOH =" ". Now Change number is mandatory in CS01, But it should me mandatory for...
View ArticleRe: KANBAN Cut over activities
Hi Friends, I came to know the solution on my own, here is the approach The initial stocks for the KANBAN manufactured parts at cut off date will be loaded to SAP as per IM methods. for the first time,...
View Articleexpected yield variance value after confirmation cancellation.
Hello Guys, I Could like understand system behavior step-1 created production order qty-2step-2 confirmed operation 10- qty-1-saved counter-1step-3 confirmed operation 10- qty-1-scrap-saved....
View ArticleRe: How to create demand planning for Configurable materials
Hi Sapients, Waiting for the Reply. Thanks in advance Regards,Hemanth.
View Article