Dear Team,
I have created control plan (CP) in transaction QPCP. Now I would like to assign this control plan while creating the reference operation set. How to assign the CP in CA11? If I assign the CP to ref.operation set, what would be process impact?
Could anyone please guide me on this?
Thanks