Hi Brahmankar,
I have attached the screenshot of the scheduling profile. The Always Batch Split check box is not checked.
Actually, when there is a batch in inventory that can fulfill the component requirement quantity, there will not be batch split.
For example if the order requires 20 KG of material B as well, then
Material | Batch | Quantity |
---|---|---|
A | 0000000001 | 20 KG |
A | 0000000002 | 30 KG |
B | 0000000006 | 50 KG |
B | 0000000007 | 50 KG |
Component | Reqmt Qty | Unit | Batch | Batch Key | Committed Quantity |
---|---|---|---|---|---|
A | 0 | KG | 1 | 0 | |
A | 20 | KG | 0000000001 | 2 | 20 |
A | 20 | KG | 0000000002 | 2 | 20 |
B | 20 | KG | 0000000006 | X | 20 |