Re: General extra material's requirement when MRP

Hi Hung,

 

Enter Material B in BOM of Material A with the quantity of Material B same as the base quantity.

 

BOM Header : Material A     Base Qty 1 PC

BOM Iteam  : Material B    1PC

 

When PIR is being entered for Material A, lets say 1000 PCs , MRP will generate requirement for Material B for 1000Pcs. The plan order generated can be converted to PR & PO once material B's requirement is finalized.

 