Hi, I would like to know how to attribute MRP settings so the subreq consumes/reduces the material's forecast (VSF). This issue only applies for a finished good that contains other finished goods. Currently, a finished good with dry goods only does not have this issue. Strategy group = 40. MD04 is behaving correctly, sales orders are consuming/reducing the forecast.
But when a finished good (parent item 1302450000000) that contains other finished goods (children item 1233480000000), there is a subreq for the children FGs. How can I adjust MRP attributes for the subreq to consume/reduce the children FG's forecast? The forecasting team enters forecast numbers for the children FGs that includes units sold individually and as part of the parent item.
Sample below.
IndReq (VSF) = 30 units (of the 30, 12 units of the VSF is forecasted for parent item 1302450000000).
My goal is to have the PurRqs to only show 30 as the total demand/PO requirement and not 42.
Image may be NSFW.
Clik here to view.
Thanks,
Kevin