Hi,
I Need a small suggestion. Now i open CR03 Here i can able to see the work centers list.
Under capacity tab and at capacity header i can see the Start time and Finish time.May i know at Which report i can able to get these fields .
I can able to get it from table level KAKO , But data is in Seconds wise , actually i need hourly wise.
And one more thing is Operation time and Capacity fields i am not able to get it from the KAKO Table.
Through the forum i was checked CR05 Report but there is no fields like Start and Finish Time.
Can any body tell me In which report can i get the details.