Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 2633

Change component allocation in CEWB for multiple routes

$
0
0

Hi All

 

I experience a huge problem.

 

I will describe the problem in a very simple manner:

 

Material A  consist of:

     0010 Material C

     0020 Material D

Material B

     0010 Material C

     0020 Material E

 

We have two routings:

1. Routing for material A

2. Routing for material B

 

Now we want to change component allocation of Materal C from operation 0010 to 0020.

 

In standard SAP i will use CA02:

1. for  Material A and change assignment of C

2. for  Material B and change assignment of C

 

I would like to change the component assignment of material C for both routings in a Mass Change

 

I have read about CEWB, but i can not find a way to solve this.

 

Do you have any experience/solution to this problem

 

 



Viewing all articles
Browse latest Browse all 2633

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>