Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 2633

Re: Standard Solution for Machine Changeover, Mid-Order

$
0
0

the in-process inspection is in the routing as a separate operation with control key QM01 and charatceristics attached to it. Will the same inspection lot be used that was triggered before entering the new operation? or will there be a different lot with the new operation's work centre?


Viewing all articles
Browse latest Browse all 2633

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>