Hi All,
A material is issued to a WIP stock location(say pp06) with a movement type x.some packing materials are also issued to same WIP location(PP06) with reference to manual reservation.At PP06,the main material is packed with packing materials and issued to warehouse.
Is there any way to track the packing material consumption and damage at WIP location at the time of material transfer from WIP location.
Please suggest the process either it can be done through sales order/sales BOM with MRP/any other suggestions?
Regards,
Shikha