creation or PO against receipt of SO
In MTO scenario we can create production order with reference to sales order, but we don't want to link between PO and SO. Because sometime business want to sell same process order stock to different...
View ArticleRe: creation or PO against receipt of SO
Hi, Please check if you can map your scenario using planning strategy 40. Best Regards,Ameya B.
View ArticleIs it possible to schedule planned order individually by planned order number?
Hi Gurus, I have a problem with scheduling a huge bunch of tiny planned orders in a week and they are subjected to a lot of changes from time to time. The issue of the adjustment is that different...
View ArticleRe: Daily Line wise , shift wise production plan
Hi Rupesh , My objective , 1. Presently we are production planning on weekly basis . The job is carried out by Central Planning department .2. After that , that plan are released to different Mfg Plant...
View ArticleRe: creation or PO against receipt of SO
If we use strategy 40 then it does create production order if we run MRP but we don't want system to create process order at the same time we put sales order in system. MTS - Strategy 40...
View ArticleRe: converting KG to LTRs based on Density
how do i do the same in reverse ..likePurchase Order - Ordering Unit is Ltrs and Base UOM is Kgand based on density Ltrs are to be converted to Base UOM Kg for each batch
View ArticleRe: How we can change the Effective parameter
Hi Brahmankar, I want to display the effective parameter with values as per below screen shot,But for that what back end configurations required please let me know RegardsArabind
View ArticleCan i map many machines reporting through one work center
Dear Experts,As i know that work center can be a machine or group of Machines. My client has 96 machines in Weaving department where grey fabric is being made. I have two choice:Open 1 work center with...
View ArticleForecast model is not updated in material master
Dear all, I am performing a forecast for my material using J (automatic model selection) model, and using forecast procedure 2. When forecast is done, forecast model is not updated and model selection...
View ArticleRe: Cancelled confirmation yield GR considered for overdelivery tolerance
Hello, It could be first clear the COGI entries and retest the same. Refer SAP Note 540392 - FAQ: Automatic goods movements3. Question: In Customizing for the confirmation (transaction...
View ArticleRe: Forecast model is not updated in material master
Hello I have just tried what you suggested. Unfortunately, the system behaviour was the same...Best regards and many thanks, Nikos
View ArticleHow to avoid delete COGI record.
Hello Experts, I read a lot of items about control records COGI DELETED here in SCN, but i have a different problem.I want to control a permission to some people delete and others not in COGI, for this...
View ArticleRe: Shifts View in Planning Table MF50
Hello, It seems to be correct, please share screen shot of MF50 and work center capacity tab details CR03. Best Regards,R.Brahmankar
View ArticleRe: COHV - Close Production Order
Hi FG (finished goods) will need to be; 1-completed technically 2-overhead allocated 2-settled 3-closedSFG-semi-finished goods will need to be settled 1-determine work...
View ArticleRe: In MRP BOM should not explode but in planned order creation and costing...
Hello, Create a New BOM status as per your requirement in OS23, Remove the check mark of MRP Explosion and assign to the BOM statusThe BOM explosion can be controlled by the MRP 4 tab in the...
View ArticleRe: Shifts View in Planning Table MF50
Hi Thanks a lot for your helpHere are the screenshots. Regards
View ArticleRe: Authoriazation object COGI
Hi Caetano,Why in this option "2 - Create an implementation of the method COGI_AUTHORITY_CHECK of BAdI WORKORDER_GOODSMVT" when i use de button red (red in image) the program not pass in this code...
View ArticleComponent Backflushing Issue with Repetitive Manufacturing
Dear PP Expert, I'm facing a problem for component backflushing using repetitive manufacturing, enclosed is the case of client: Repetitive Manufacturing with Planned Order only, no Production Order...
View ArticleRe: Shifts View in Planning Table MF50
Hello, In CR02 you try by maintaining Active version - 01 Normal available capacityIn MF50 select Shift and production date Best Regards,R.Brahmankar
View ArticleRe: Minimum BOM quantity
Hello, In this case use the Fix lot size as 5 in MPR 1 view for this component.In BOM maintain component quantity as 3.5.So MRP will generate the order in multiple of 5 and consumption will be always...
View Article