Quantcast
Browsing all 2633 articles
Browse latest View live

Re: Hi experts can you please tell me what is the difference means strategy...

Hello Karthik           VSF and LSF are requirement type of  MTS   Planning Strategy 40 and 10 respectively.These are  differed in consumption of Planned Independent Requirement.  VSF - PIR will be...

View Article


Re: 101 Mov. Co-products only, not principal product

Hello  Please share the Procurement type/Spl Procurement type  and material typeof the Principal materials. If Possible send the Process order component view with full screen.  Regards,Velmurugan S

View Article


Re: SAP PP/WM Kanban cycle

Hi Kishan and Rohit, Thanks for your replies Please correct if i am wrong that there is no kanban control board for the materials staged using LPK1 control cycles.  Further -I would like to know if...

View Article

scheduling in the past

Dear Expert ; I want to allow the scheduling in the past only in LTP.  I maintain scheduling type as backward 365 days ( in OPU5) on my scenario but it does not work .so I add start in the past in "...

View Article

Re: BAPI For Process order confirmation COR6

Hi, Thanks, I will check.

View Article


Re: BAPI For Process order confirmation COR6

Hi Sabine and  Caetano, thanks for your reply, I have tried with calling BAPI_TRANSACTION_COMMIT after main BAPI. but still it is showing same message as "Confirmation saved successfully" without any...

View Article

Re: BAPI For Process order confirmation COR6

Just to be sure, did you see goods movements in COR6 if you enter the same data and call goods movement screen?

View Article

Re: BAPI For Process order confirmation COR6

Hi, Please check 1. back flush is active.2. Material is in stock.3. MM period is open.

View Article


Re: Collective Order : multiple orders for same product

Thanks for your reply Caetano. I was afraid to get this answer, but it seems logical wtih the collective order philosophy.I will try the solution of bulk material. RegardsPierre

View Article


Re: Error "12018" "Enter Date of Production" during "Cancellation of...

Hello,Issue is resolved. Thanks a lot Sabine & Brahmankar Sir Regards,Sumit.

View Article

Re: BAPI For Process order confirmation COR6

Hi, Yes it is working fine in COR6 for Partial confirmation also.

View Article

Re: BAPI For Process order confirmation COR6

Okay, so the customizing should be fine.You said COR6 but than refer to BAPI to post HEADER confirmation. So to post COR6 via BAPI the correct one to use is BAPI_PROCORDCONF_CREATE_TT. To propose the...

View Article

MD4C excel report

hi,we have MD4C report where we want to download the output of that reportwith few fields.Problem here is that it displays/downloads all the fields of which fewwe do not need. So when we checked the...

View Article


Re: MD4C excel report

Hi NIkhil, You can create user specific layout or modify the existing standard layout. Just click "select lay out" drop down and go to manage Layouts. Select the standard one and click on "Change...

View Article

co-product without goods receipt

Hello, We have a Unit, which produce Product and Co-product.So I have to plan this Co-product in the BOM. After that I create process order which contains this Co-product. But we have two situations:1....

View Article


Re: co-product without goods receipt

Hi,Need more information. What is the deciding factor for generation of co product in production process.

View Article

Re: Best planning strategy for my case?

Swathi,Depending on what you are trying to accomplish; may have to review again. By your earlier comments, what is the challenge in using strategy 40 then?this should help in differentiating the issue....

View Article


Re: Best planning strategy for my case?

Sameer, if I use strategy 40, then I will be producing my product B to stock..business doesnot want to do that.. they want to wait till a real demand come and then they want to produce the finished...

View Article

Re: Production Order Cancellation

Hi Madhu, 1. Check the Production order status for goods movement(GMPS), PCNF/CNF and delivered (DLV). Cancel everything if those status are active, then try to put Deletion flag / TECO the order. 2....

View Article

Re: Production order type determination for strategy 82

Hello If the issue has been solved, please close the thread selecting the correct answer. See the blog How to close a discussion and why for details. RegardsCaetano

View Article
Browsing all 2633 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>