Un-Grouping a routing using CA02
I have many parts that have goruped routings. I need to begin removing some part numbers from the group and give them a stand alone routing. Is there a way to simply ungroup individual routings? I have...
View ArticleRe: Work center breakdown details without PM
Hi Rupesh, Is it possible to send the breakdown times entered in APO to ECC somehow? I want to see KBED table updated with the available capacity based on that breakdown. Sumeet
View ArticleRe: Un-Grouping a routing using CA02
hi Chris, goto ca01, enter material, plant and date. and click on copy from select routing.and enter plant group and key date.you can choose your routing and bom.once selected it will copy the...
View ArticleRe: Simulative planned order vs Simulative dependent requirements
Hello Note 12955 talks about the pegged requirements and it provides a good explanation about the system desing: The respective current data on stocks, issues and receipts of the materials in question...
View ArticleRe: Capacity Utilization - Past report
Hi, In standard SAP don't have such reports, Please sit with an ABAPer and generate a Zreport to meet your requirement. Thanks With Regards,Dinesh Kumar V.
View ArticleRe: Decrease production order remaining quantity without good receipt
Dear , there are two possible way:1 ) you can try to execute a confirm with scrap quantity, so that the following operations update the production quantity to 6 pc. 2) If you need to have the stock...
View ArticleRe: Decrease production order remaining quantity without good receipt
Thank you Daniele but scrap quantity field in CO11N does not effect the production quantity, still I have 4 open quantity in md04. I do not want stock fro scrap.
View ArticleRe: BOM group number configuration
Hi,Thanks for your reply. got the answer ThanksKumar
View ArticleRe: set Batch during production confirmation
Hello R. Brahmankar and Sabine, thanks for your support. At the end I get BAPI WORKORDER_GOODSMVT with method GOODS_RECEIPT running. There I was able to adjust the batch each time during prod...
View ArticleRe: Planned order not generated after MRP Run
Hello Gomes, There are number of reason to not generate Planned order for your finish material. 1. You need to check the Plant parameter in your system. 2. MRP View in material master IF possible...
View ArticleCapacity reserve with routing with status 'Released for costing'
Hi all. Does anybody knows if there is a point in customizing, in IMG... with wich I can do that the Capacity Reserve consider rountings with status '3' 'Released for costing'??? Thanks in advance!!...
View ArticleRe: MD04 inconsistencies for subcontracting purchase order .
Thank you for the update! If the issue has been solved, can you please close the thread selecting the correct answer? In addition, if you have similar issues in the future, I suggest you to check the...
View ArticleRe: Un-Grouping a routing using CA02
Thanks Solomon, I have tried this and I still have the same group number on the new routing? The group counter is different but the group number is the same as what was copied?
View ArticleRe: Decrease production order remaining quantity without good receipt
Hi Hasan I think this is not possible in standard. you have to Develop your own logic. But what i would suggest , Go for Mov 531 for 1Pc . Maintain its value 0.000 and consume it with...
View ArticleSingle report for requirement and receipts with quantity and value
Hi All I am looking for a report that will give me information on product group and SKU level from current date to future say 12 months.... 1. Gross requirement 2. Scheduled receipts3. Projected stock...
View ArticleRe: Planned order generation based on total lines items of sale order
Hello Try the approach proposed on the following document: How to create separate planned order / purchase requesition for same date BRCaetano
View ArticleRe: Is it possible for me to use the costing BOM (usage 6) for LTP scenarios?
Hello, In material master MM03 and select MRP4 view and check the BOM Selection method Check if selection method of BOM explosion is relevant with production version.change selection method's value to...
View ArticleRe: Planned order not generated after MRP Run
Hello, Please give the planning file entry MD23 screen shot whether NETCH or NETPL indicators are marked or not? Best regardsShailesh
View ArticleRe: Old Process Orders
Hello, During the WIP calculation, statuses DLV (Delivered) and TECO (Technically completed) are interpreted period-dependentlyFor determination of DLV and TECO status, please review SAP Note 530563 -...
View ArticleBatch classification during GR against production order using txn MIGO
Hello All I am usng batch classification during for movement type 101, when am doing the GR against production order using txn MB31 the system automatically navigates to classification screen...
View Article