Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 2633 articles
Browse latest View live

Single PR after MRP run of CBP materials

Dear SAP Experts, We are executing CBP based MRP of 100 materials. Currently system is generating separate PR of every material. Is it possible to generate single PR which contain all materials....

View Article


Kanban for MRP

Hey there! I am trying to find information about MRP and Kanban in S/4. Is there a Fiori app that supports kanban?

View Article


Image may be NSFW.
Clik here to view.

Displaying a transaction in a multi-tab screen

Good morning.I have created a multi-tab screen with 4 tabs, as the bellow screen shows. In each of them i want to display and run e different transaction. For example, in tab "Control System" i wish to...

View Article

Re: Displaying a transaction in a multi-tab screen

Hello NikosThis is pure technical query. You should post this in ABAP space. Good luckKJogeswaraRao

View Article

Re: Variant Configuration worOrder Splitting with different sales order

Hi Puri, Thank you for your reply, I know that this message seems logic reference to my configuration, but what I need is to create sales order with costing that should not trigger production order as...

View Article


Re: Variant Configuration worOrder Splitting with different sales order

Hi Brahmankar, I am using strategy 25 (Make to order for Configurable material which allows the variant configuration. Best Regards Keroles Abader

View Article

Re: Production order overlapping in CM27

Hi Can you explain the requirement clearly?

View Article

Re: Production order overlapping in CM27

Hi, while dragging the production order into individual capacity, it should not overlap to other production order, it should give error if we are dragging. we like to place production order...

View Article


Re: BADI: MD_CHANGE_MRP_DATA~CONSIDER_OTHER_SD_TYPES

Hello Are you sure that the method and the BAdI implementation are active on your system? You can check that on SE18. BRCaetano

View Article


Re: Different Planned Order Number Range for Sale Order & PIR.

Hello This method should not be used to change any planned order data and I don't that it would be possible to change the planned order number. BRCaetano

View Article

Junk Text in Production Order

Hi Experts,   Good Day!   I am facing the following issue in production order.   in Production order our has maintained the operation text in Chinese language.    but in the soft copy of production...

View Article

Re: Kanban for MRP

Hi Felix Here is a complete lies of the PP Fiori Apps: SAP Fiori 1.0 for SAP ERP - SAP Library I don't see anything specific for Kanban. BRCaetano

View Article

Re: MD04 requirement getting disappeared

HelloI have checked the above configurations, could not find anything related to the above points.The main thing is that both the sales order have the same scheduling line category as well as same item...

View Article


Re: MF50 Planning table collective Selection by MRP Controller?

Seems there is no standard functionality to change, any one had worked on this development earlier? Thanks

View Article

Serial numbers allow repeated on-hand

Hi Team, Please guide on the below client issue as below: A material with obligatory serial number can be received against a Production order giving it status ESTO. The serial number can then become...

View Article


Logical Path error in LSMW

Hi i tried to create LSMW but in specify file i made some mistake not able to identify....but when i created another LSMW object i am getting erro for dipaly read reocred as below and in attached...

View Article

Re: Junk Text in Production Order

Hi Almeida,i am facing this issue in pdf only.Thanks in advance.   Regards   Blessing

View Article


Re: Getting bad availability check information.

Hello Sweat, This is standard behavior which you are observing. To switch the functionality of Availability check of desired Material only, you need to deploy Availability check against full...

View Article

Re: how to get detailed information in rough cut planning for product group?

thanks Venkatesh..but my issue is solved. I forget to add members detailed information in planning type.

View Article

Re: Component Allocation View in CA03

Hello Totchiki, The BOM exploding will depends on the validity of that particular BOM i.e. the validity from date is not valid while creating the production order / Routing system will not copy the...

View Article
Browsing all 2633 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>