Dear Gurus,
for the planning start option for the planning type i have the following scenario, where looking for hte gurus feedback.
1. i am sitting in dec, 2015 and wants to enter the plan in sop from july-2015 to june-2016. (how, if in mc8b i enter the planning start from july, 2015 system give me the required grid, but what happen when i will go in the time period lets say in june 2016 where i wants to enter the plan from july-2017 to june 2018.
please advise me at your earlist, its not i think possible to change the mc8b every time for the required result.
Looking for the gurus feedback.
regards,
imran kan