Re: Error determining planning periods for calendar xxx

$
0
0

Hi,

 

1) Planning horizon value is 365 in table T399D. Table T483M is empty, so Planning horizon is maintained on plant level. I cannot check whether the planning horizon has been assgined to the relevant MRP gorup as I'm missing some user rights until next week.

 

2) Lot size used is EX = Lot-for-lot order quantity


Viewing all articles