Dear Sir,
Is there any T code to result a report to collectively access the procurement elements (Planned orders, Purchase Requisitions) of all the materials for which MRP run has taken place, in a single list?
My client's need is as follows. After MRP run we required cumulative item wise report of MRP output, (item, opening balance, plan, requirement, scheduling, order etc.) so that purchase person can check it out.
I have tried with T code MD07. But it doesn't provide detailed report.
Please provide the T code if there is any.
Thanks,
Prasad Inamdar