Hi,
Pls read my reply to mr.PardhaSaradhi Reddy.Chelikam.
My requirement is Subcontracting for a Single Operation only.
If can able to save the PO for this operation i'll generate a legacy DC with reference to this PO and transfer the intermediate material ( i.e., RM + 1st Operation Completed Material) to vendor.
And while making GRN for this PO i will get (RM+1st)+2nd Operation Completed Material from vendor at the time i'll close my legacy DC too...
This is Work Flow.
There is not requirement for Material Provision Indicator since there is no Vendor supplied material.
Thanks With Regards,
Dinesh V.