Hello,
System displays the actual number of splittings on the operation detail view "Splitting". please check.
If the number of splittings entered does not match the number of the individual capacities stored in the work center of the operation for the capacity relevant to scheduling, the system uses the smaller value of the two values for the calculation (Note 101308) - Number splittings during required splitting
Best Regards,
R.Brahmankar