Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 2633

Re: shelf life

$
0
0

Hi,

 

Below may be the one of the solution. I am also new.

 

1. Create two separate storage location A cold room and B shop Flore.

2. Transfer material from A to b with movement type 311.

3. After cutting activity balance material transfer to cold room B with movement type Z11.

4. Movement type Z11 is copy of movement type 311 but activate inspection type 08.

5. So that when material get transferred system create inspection lot.

6. Then record the result if any and in UD tab update the balance life  manually

7. And post the UD.


Viewing all articles
Browse latest Browse all 2633

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>