Hi Uwe,
We send a control recipe to an external Weigh&Dispense system and receive a message back to change the status of the control recipe after the weighing has been finished.
We tried using process message category PI_CRST, but get error "Control recipe destination does not exist in this order". when using PI_CRST2 all works fine, but we do need to add the control recipe destination to the message.
We do not use decentralized process management, or is the W&D system regarded as a decentral system and is that why we need to use PI_CRST2?
by the way; we do use XSteps to generate the control recipe and therefore the control recipe destination is not in the phase, perhaps that causes the error?
Regards,
Kees Meyboom