Hi,
I have a planned order for 150 nos.
When i execute Collective Availability Check (Missing Part List) in MDVP, for a particular BOM Item, System is showing Committed Qty as "0" and Required Qty as "150".
But the stock available is 200 nos. Then Why system is showing above result.
Note: Storage Location is Excluded in MRP RUN.
Regards,
Dinesh V.