Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 2633

Re: Material Master - Availability Check & Individual / Collective Indicator

$
0
0

Hi Shubham,

 

I may understand as below. Please correct me if I am wrong.

 

Assume we have FERT material M1. For this FERT material I have created BOM which has BOM component as M2.

 

If I assign the availability check as 01 in material master of M1. The value 01 is applicable for material M1. And if I assign the "individual / collective indicator = 02" in M1 material master, this value 02 is applicable for M2 (Dependent requirements) and NOT for M1. Is it right?

 

Or I need to assign the "Individual / Collective indicator = 02 in M2 material master?

 

Bit confusing for me. Please guide me

 

Thanks


Viewing all articles
Browse latest Browse all 2633

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>