Just an FYI to anyone who may find this thread, the above information is not entirely correct. By entering SATISH88 as the Main Work Center in the equipment, it will be defaulted at the operation work center on the PM03 order. As such, the resulting maintenance order will create a direct capacity requirement on that work center. You only need to maintain the production work center on the Location Tab, and the system indicator on the work order, as well as the relevant capacity settings in the work center.
If you click on the link "Integration between PP module and PM module" you'll see that it was removed for being incorrect.