Re: Mass Update to Requirements

$
0
0

Hi Carl

 

There is no standard functionality to mass update a production or process order component/requirement. You must enter the production order manually and re-read the master data.

 

An alternative is to use the discontinuation process, adding a follow-up material on tab MRP4 of the material master. This way, the requirement will be re-directed automatically to the follow-up material by the ATP check, after consuming all the stock of the discontinued material.

 

 

BR
Caetano