If we choose "Confirmation Required" in control key, then a confirmation has to be done at that operation. is this true for a milestone confirmation also? (i.e) is a confirmation mandatory for an operation with milestone confirmation.
Also is there a sequence to be followed the way a "required confirmation" and "Mile stone confirmation" should appear in routing with multiple operations.,say op# 10,20 30 ,40 &50. ?