PP- Confirmation required in control key

If we choose "Confirmation Required" in control key, then a confirmation has to be done at that operation.  is this true for a milestone confirmation also? (i.e) is a confirmation  mandatory for an operation with milestone confirmation.

 

Also is there a sequence to be followed the  way a "required confirmation" and "Mile stone confirmation" should appear in routing with multiple operations.,say  op# 10,20 30 ,40 &50. ?