Hi,
(3) Created the Recipe in C201. without Recipe - material assignment.
Here I will only update the Recipe Header and Recipe Operation tabs manually. I will not update the material tab. I normally do that using the data load.
I can do recipe - material assignment in the C202 by entering the recipe, recipe group counter, then selecting the material tab, then in the material popup, if I select "other material" button, then enter ONLY the material, plant and NOT prod version, the SAP picks the Prod Version (created via MM02-> MRP 4), and i can do the operation/phase assignment to the BOM components. That is not an issue.
But, as per my original post, if I try to do in a different way, it gives me that error. Not sure, if that is how it is supposed to work.
Thanks!
Puneet.