Hi.
We plan to produce many materials with different execution. For example one material can have 3 lenghts (L). For example
Material A, L=100
Material A, L=150
Material B, L=50
Material B, L=70.
So before producing I want to create reservation for Material A, L=100. How can I do it?
My ideas:
1. At first create batch for Material A with classification L=100 . And after that when create reservation put this butch. After that create production order and do goods receipt using this batch. But it is hard always create different batches for many materials with different classification.
2. Have 2 materials in SAP for material A:
Material C, L=100
Material D, L=150
In this case we do not create always batches. But have many Materials in the system.
So any advices?