Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 2633

WIP Batch - WIP To GR Process

$
0
0

Hello,

 

I have 3 step production operation and at the end of each operation, I create a WIP batch.  At the end of the 3rd operation, I am trying to link my WIP (at the top most level) to the GR batch to complete production and receive my final product.  However, when I look at the details of my WIP batch in "goods mvoement" tab, there is a 521 movement being performed when it should be 522.  I need the WIP batch to be reduced to 0 and 101 for my GR batch.  

 

Goods Movement 521.png

 

See addition, when I do the final posting, I get the below error.  Does anyone know what this happens?

Internal data tables inconsistent; cancel confirmation

 

Thanks,

Anurag


Viewing all articles
Browse latest Browse all 2633

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>