Dear Rupesh,
I have set the message RU024 as warning, and in OPK4 I have set the operation sequence as "Operation sequence is not checked".
However, when I confirm the lead production order OPER1, system still issue the error message RU024.
I am afraid RU024 is fixed as error message in collective order in SAP.
Does anyone have the other solution to fix this problem?
Best regards,
Felix